Milestone
1975:
Incorporated as Balrampur Chini Mills Limited by taking over the operations of the erstwhile sugar factory of Balrampur Sugar Company Limited in East Uttar Pradesh.
1990:
Acquired Babhnan Sugar Mills Limited with a capacity of 1,000 TCD.
1995:
Diversified into distillery operations at the Balrampur unit through the commissioning of a 60 klpd distillery.
1998:
Acquired Tulsipur Sugar Company Limited with a capacity of 2,500 TCD.
2003:
Ventured into a 19.55 MW bagasse-based power generation unit at the Balrampur facility.
Set up an integrated greenfield sugar complex at Haidergarh in East Uttar Pradesh with a sugarcane crushing capacity of 4,000 TCD and co-generation capacity of 20.25 MW.
2004:
Set up distillery operations at the Babhnan unit, with a capacity of 60 klpd.
2005:
Acquired the Rauzagaon unit from The Dhampur Sugar Mills with a sugarcane crushing capacity of 7,500 TCD and co-generation capacity of 12 MW.
Established an integrated greenfield sugar complex at Akbarpur in East Uttar Pradesh with a sugarcane crushing capacity of 7,000 TCD and co-generation capacity of 18 MW.
2006:
Set up an integrated greenfield sugar complex at Mankapur in East Uttar Pradesh with a sugarcane crushing capacity of 8,000 TCD and co-generation capacity of 34 MW.
Taken over the management of Maizapur Chini Mills a unit of Balrampur Chini Mills Limited.
2007:
Set up integrated Greenfield sugar complex at Kumbhi in Central UP with sugarcane crushing capacity of 8000 TCD and cogeneration capacity of 20 MW.
2008:
Set up integrated Greenfield sugar complex at Gularia in Central UP with sugarcane crushing capacity of 8000 TCD and cogeneration capacity of 31.3 MW.